Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Adedigba, A A (2022) Towards integrated sustainable solid waste management in Nigerian cities, Unpublished PhD Thesis, , Northumbria University.

Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Alhiddi, A M (2022) Building better together: the relationship between organisational culture and stakeholder critical success factors in construction projects, Unpublished PhD Thesis, , Northumbria University.

Alnasseri, N (2015) Managing and controlling airport construction projects: a strategic management framework for operators, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Alqarni, M (2017) Developing a framework to improve the implementation of geospatial technology in the planning and delivery of infrastructure for residential areas in Saudi Arabia: a case study of Riyadh city, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects, Unpublished PhD Thesis, , Northumbria University.

Babatunde, S (2015) Developing public private partnership strategy for infrastructure delivery in Nigeria, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Bouazza, T (2019) The design of healthcare facilities: knowledge, methods and effectiveness, Unpublished PhD Thesis, , Northumbria University.

Chen, X (2019) Developing a third party investment partnership framework to encourage low carbon building projects in China, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Chiponde, D B (2023) Learning from project-related failures in UK construction project based organisations: an examination of actor approaches, intentions and behaviours, Unpublished PhD Thesis, , Northumbria University.

Doherty, M M (2022) Exploring the expansion of planners' engagement capabilities via accessing the data from a building information model for public consultation, Unpublished PhD Thesis, , Northumbria University.

Gledson, B J (2017) Innovation diffusion within the UK construction sector: a study of the adoption of 4D BIM, Unpublished PhD Thesis, Faculty of Engineering and Envionment, Northumbria University.

  • Type: Thesis
  • Keywords: construction project management; construction planning; building information modelling; BIM; diffusion of innovations; innovation diffusion theory
  • ISBN/ISSN:
  • URL: http://nrl.northumbria.ac.uk/id/eprint/32529
  • Abstract:

    The construction industry suffers from a time predictability problem. To address this, previous research has investigated various improvement strategies, including the exploitation of innovations. An innovation is some ‘thing’, unfamiliar to an entity, which can facilitate product, process or systemic improvements. Innovation diffusion theory (IDT) is the body of work concerned with explaining how some innovations successfully ‘stick’, whilst others fail to propagate. These phenomena occur across society, but construction is particularly perceived to suffer from a low ‘innovation rate’. 4D BIM is an innovation with potential to provide construction planning improvements that can address the time predictability problem, but there are concerns around its prospective industry absorption. This research investigates the applicability of classic IDT to the adoption of 4D BIM by the UK construction industry. A mixed-method study was undertaken, informed by a pragmatist philosophy. It combines an initial exploratory stage that uses case study and questionnaire survey research, with a subsequent explanatory stage concurrently employing a second questionnaire survey with semi-structured interviews. Classified as a modular technical process-based innovation, use of 4D BIM is found to advance construction planning. It increases feedback opportunities, planning efforts, and the quality and validity of the plans produced, whilst also having potential for improving project time performance. It is established that 4D BIM usage is principally limited to work-winning, methods planning, and the visualisation of construction processes, alleviating problems of communication and understanding. The importance of existing diffusion concepts of compatibility and trialability, are reinforced, and several new contributions are made. These include: how organisations using BIM risk employing hybrid project information delivery processes, resulting in duplication of effort and inefficiency; how personal use of 4D BIM is linked to organisational characteristics; and what the usual time lag between first awareness and adoption is. Furthermore, an existing innovation-decision process model is built upon, with additional stages, decision- action points and outcomes added. This new model can assist in the future adoption/rejection decisions of such modular technical process-based innovations.

Guo, S (2012) Pedagogical design in built environment distance education: A critical appraisal of students' learning strategies at postgraduate level, Unpublished PhD Thesis, , Northumbria University.

Hope, A (2011) Greener homes for the future?: sustainability in PFI local authority social housing, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Li, J J (2023) A socio-technical framework to guide implementation and value realisation of distributed ledger technologies (DLT) in the construction sector, Unpublished PhD Thesis, , Northumbria University.

Maduka, N S (2017) The role of knowledge management in assisting key stakeholders in making informed decisions in delivering sustainable retrofitted building projects, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Ojiako, U (2005) Project failures: a comparative study of information and communication technologies (ICT)and construction projects, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties, Unpublished PhD Thesis, , Northumbria University.

Osborne, A N (2005) Social conflict in construction-related inter-organizational collectives: A comparative analysis and structural equation model, Unpublished PhD Thesis, , Northumbria University.

Parry, A (2015) The improvement of delay analysis in the UK construction industry, Unpublished PhD Thesis, School of the t Environment, Northumbria University.

Pearson, J (2014) Effective employer engagement in full time construction-related foundation degrees, with particular emphasis on workplace learning, Unpublished PhD Thesis, , Northumbria University.

Ponton, H (2021) Social interactions in construction design team meetings, Unpublished PhD Thesis, , Northumbria University.

Rodrigo, V (2016) Development of an e-business capability maturity model for construction organisations, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Ruan, X (2007) Inter-organizational Knowledge Integration on Construction Projects: a Social Network Approach, Unpublished PhD Thesis, School of Built Environment, Northumbria University.

Sharma, M (2014) Architectural design quality in local authority private finance initiative sheltered housing projects: the development of an evaluation tool, Unpublished PhD Thesis, School of the Built Environment , Northumbria University.

Vasenin, M (2022) A data-driven approach to green investments: environmental performance, mispricing, and momentum, Unpublished PhD Thesis, , Northumbria University.

Victoria, M (2017) Developing decision support models for early stage embodied carbon management in buildings, Unpublished PhD Thesis, , Northumbria University.

Wu, S (2010) The impact of collaborative working on construction project performance, Unpublished PhD Thesis, School of the Built Environment, Northumbria University.

Zhao, J (2022) Rethinking value for money in Public Private Partnerships: a critique, analysis and model for transport infrastructure projects, Unpublished PhD Thesis, , Northumbria University.